Same-day quotes available Reports delivered in days, not weeks Call (708) 233-6655

ISTA Package Testing.
Results in Days.

ISTA-accredited testing lab serving manufacturers nationwide. Every series from 1A to 6A, staffed by engineers, with same-day quoting and rapid turnaround. Trusted since 1955.

Get Your Quote
Available now
Most quotes returned same business day
You'll speak with an engineer, not a sales rep
or call us directly
(708) 233-6655
10,000+
Tests completed
978
Clients served
1955
Established
5
Accreditations held
Accredited & Recognized By
ISTA - International Safe Transit Association A2LA - American Association for Laboratory Accreditation ASTM International TAPPI - Technical Association of the Pulp and Paper Industry SEFA - Scientific Equipment and Furniture Association
4.9 ★★★★★ on Google
★★★★★

"Incredible customer service, highly responsive, and the gold standard in the industry."

JV
James Vancel
Google Review
★★★★★

"Knowledgeable of all UN DOT regulations. Strictly by the rules testing lab at a fair market price. UN test reports are easy to read and detailed as required by the Department of Transportation."

CH
Carlos Hernandez
Google Review
★★★★★

"Professional, accurate, thorough, and responsible. A positive and learning experience with every testing engagement at Gaynes. Highly recommended."

JC
Joseph Claffy
Google Review
Gaynes Labs testing facility

Every ISTA Series. One Lab.

Whether you need basic integrity screening or a full retailer-specific simulation, we run the complete ISTA programme in-house. No subcontracting, no delays.

ISTA 1 Series

High volume

Non-Simulation Integrity Tests

Basic performance screening for individual packages. Tests the strength and robustness of product-plus-package without simulating a specific distribution environment. Ideal as a benchmark or early-stage design screening tool.

1A (≤150 lb) 1B (>150 lb) 1C Extended 1G Random Vib

ISTA 2 Series

Partial Simulation Tests

Combines basic integrity elements with general simulation components like atmospheric conditioning and mode-shaped random vibration. A more thorough evaluation than Series 1, adding environmental factors to mechanical testing.

2A (≤150 lb) 2B (>150 lb) 2C Furniture

ISTA 3 Series

General Simulation Tests

Full laboratory simulation of damage-producing motions, forces, and sequences encountered across vehicle types, routes, and handling exposures. The standard for validating real-world distribution performance.

3A Parcel 3B LTL 3E Unitized / FTL

ISTA 6 Series - Amazon, Sam's Club, Walmart, Costco

Retailer-specific enhanced simulation testing. If you're an Amazon vendor needing ISTA-6 SIOC or Overbox certification, or meeting Sam's Club, Walmart, or Costco compliance requirements, we run these programmes daily and turn results around fast.

Get ISTA-6 Quote
À La Carte Testing

Individual Test Components

Don't need a full ISTA programme? We run each component individually - useful for design validation, troubleshooting, or non-standard requirements.

Drop Testing (free-fall)
Random Vibration
Static & Dynamic Compression
Incline / Horizontal Impact
Sinusoidal & Rotary Vibration
Environmental Conditioning
Clamping Force Testing
Humidity Testing
Rotational Edge Drop

Quote to Report in Days

Our process is built for the timelines packaging engineers actually work to. No backlog, no administrative hold-ups.

Package testing workstation at Gaynes Labs
1

Contact Us

Call, email, or submit the form. Describe your product, packaging, and which ISTA test you need. Not sure? Our engineers will advise.

2

Same-Day Quote

Speak directly with a testing engineer who can scope and price your project immediately. No sales middlemen, no multi-day wait.

3

Ship Your Samples

Send your packaged product to our Chicago lab. We confirm receipt and begin testing as soon as materials arrive.

4

Get Your Report

Testing and report delivery typically completed within days. Every report includes full protocol documentation, photographic evidence, pass/fail determination, and compliance certificates, formatted so you can submit directly to your retailer or regulator without rework.

Why Gaynes Labs

Built for Engineers Who Need Answers Fast

Instant Quoting

Our technicians quote on the spot if you know your test specs. No forms-then-wait. Call us and get a number before you hang up.

Engineer-to-Engineer

Nearly all staff are engineers with an average tenure of 13 years. You'll speak with someone who understands your compliance requirements and packaging challenge.

70 Years of Testing

Operating since 1955 with 978 clients and 10,000+ tests completed. From startups to Fortune 500 companies validating global supply chains.

Chicago-Based, Nationally Serving

Located in Bridgeview, Illinois - ideal for Midwest manufacturers. We also serve clients across Texas, California, and nationwide. Ship samples from anywhere.

Purpose-Built Testing Facility

Calibrated and maintained to comply with ISTA, ASTM, and TAPPI test apparatus requirements.

Environmental testing chambers at Gaynes Labs
Lansmont Vibration Table
LAB Vibration Table
Reille Compression Tester
Conbur Incline / Impact Tester
Free-Fall Drop Tester
Environmental Chambers
Freezer Chamber
Drying / Aging Ovens
7-Foot Revolving Drum

What Engineers Ask Before Testing

Straight answers to the questions we hear most from packaging engineers evaluating labs.

Standard testing and report delivery is completed within 3-5 business days of receiving your samples. Expedited turnaround is available for deadline-driven projects. We confirm your timeline before testing begins so there are no surprises.

Every report includes full protocol documentation, test parameters, photographic evidence, pass/fail determination, and compliance certificates. Reports are formatted for direct submission to Amazon, Costco, the DOT, or any other accepting body without rework.

We run every ISTA series in-house, from 1A through 6A, plus individual test components. No subcontracting, no outsourcing. If you need a retailer-specific protocol like Amazon ISTA-6 SIOC/Overbox, Sam's Club, Walmart, or Costco, we run these programmes daily.

Ship your packaged product to 9708 Industrial Drive, Bridgeview, Illinois 60455. We have full dock access for pallets, drums, and oversized specimens. We confirm receipt the same day your samples arrive and begin testing immediately. Midwest manufacturers often get next-day delivery.

Nearly all Gaynes Labs staff are engineers with an average tenure of 13 years. You work with the same engineer from quote through report delivery. No hand-off to a sales team, no junior technicians running your programme unsupervised.

Yes. If you are working against a product launch, retailer deadline, or regulatory submission window, we can accommodate accelerated timelines. Call us directly at (708) 233-6655 to discuss your schedule.

Yes. Gaynes Labs is an independent, engineer-owned testing laboratory with no ties to packaging manufacturers or suppliers. Our results are accepted for regulatory submissions, retailer compliance, and any context where third-party independence is a formal requirement.

Ready to test your packages?

Tell us about your testing needs, and we will provide a plan that is built around your timeline and compliance requirements.